I was on site in Revere last week at our Waterfront Square project and can happily report that the pylons have gone up for the pedestrian bridge that will connect the beach to mass transit and parking. The walking surface is under construction with the steel span expected to be complete this week. The stairs from the west are in place and paver installation is ongoing on the plaza.
The bridge is scheduled to be complete this fall, with the entire plaza complete January of next year. This is truly a transformational moment at the site and I suggest that if you are in the area, a quick drive by is worth the trip.
Topics: Infrastructure